JCM provided commercial scaffolding in Urmston for painting work to a front elevation on Stretford High Street. A highway permit and exclusion zones supported safe access for pedestrians during erection and dismantling, and the scaffold was erected in two days.
Location
Project Type
Duration
Team Size
Published:
Project Overview
The brief was to provide safe access to the property frontage for painting beside a busy pedestrian route. JCM coordinated the required permit and planned exclusion zones for both installation and dismantling so decorators could work at height while public movement was managed.
Client
Location
Project Type
Scaffold Type
Status
✓ Completed 2026
Our Approach
Our scaffolders erected the front-elevation scaffold in two days. The completed structure gave painters safe access to the façade, and the exclusion zones were used again when the scaffold was dismantled. For another high-street job involving permit coordination, see our commercial shop-front scaffolding in Sale.
We surveyed the front elevation and pedestrian flow before planning a permitted scaffold that provided practical access without blocking the high-street route.
A highway permit and controlled exclusion zones separated the scaffold team and pedestrians during erection and removal.
We coordinated the access arrangement with the painting programme and kept the dismantling stage within the same pedestrian-safety plan.
The scaffold was installed within the agreed two-day programme, keeping disruption to the busy high-street setting controlled and leaving the frontage ready for painting.