We erected scaffolding to the front of a property on Stretford High Street, providing safe access for painting works. A permit was required for the scaffold, and exclusion zones were set up during both erection and dismantling because of the heavy foot flow. The scaffold was erected in two days.
Location
Project Type
Duration
Team Size
Published:
Project Overview
JCM Scaffolding Ltd was appointed to provide safe access to the front of a property on Stretford High Street for painting works. Because the scaffold was positioned alongside a busy pedestrian route, a permit was required and exclusion zones were established for both erection and dismantling.
Client
Location
Project Type
Scaffold Type
Status
✓ Completed 2026
Our Approach
Our team erected the front elevation scaffold over two days, with exclusion zones in place to help manage the heavy foot flow safely. The completed scaffold provided the access needed for the painting works, and the same controlled approach was used during dismantling.
We assessed the front elevation, the high-street setting and the pedestrian flow to plan a permitted scaffold that would provide safe access while limiting disruption to the public.
The required permit arrangements and exclusion zones were coordinated for both erection and dismantling, helping to protect pedestrians and maintain a safe working area around the property.
The access arrangement was planned around the painting programme, with exclusion zones available for the dismantling stage when the scaffold was no longer required.
The scaffold was erected within the agreed two-day programme, keeping disruption to the busy high-street setting controlled and leaving the area ready for the painting works.