Birdcage & Crash Deck Scaffolds on Mill Redevelopment

We erected two birdcage crash deck scaffolds for a mill redevelopment project in Bolton. The structures provided safe access while large concrete slabs were cut out to make way for the installation of new lifts and stairs. Both scaffolds were erected in three days, and the project is still ongoing.

Location

Bolton

Project Type

Birdcage / Crash Deck Scaffolding

Duration

3 days (Erection) – Ongoing

Team Size

Published:

September 3, 2026

Project Overview

The Brief & Scope of Work

JCM Scaffolding Ltd was appointed to provide safe access within a mill redevelopment project in Bolton. The brief was to erect two birdcage crash deck scaffolds so the contractor could cut out large concrete slabs for the installation of new lifts and stairs. As the redevelopment is still ongoing, the scaffolds were required to provide a secure and dependable working platform for the early structural works.

Client

Commercial Mill Redevelopment

Location

Bolton

Project Type

Birdcage / Crash Deck Scaffolding

Scaffold Type

Two Birdcage Crash Deck Scaffolds

Status

✓ Completed 2026

Our Approach

How We Delivered The Project

Following the site requirements, our team erected both birdcage crash deck scaffolds in three days. The completed structures created safe working areas around the slab openings and gave the wider project team the access needed to continue the lift and stair installation works.

Design & Survey

We assessed the internal mill spaces and the areas where the concrete slabs were being removed, then planned the two birdcage crash deck scaffolds to provide practical access around the planned lift and stair openings.

Safe Setup

The scaffolds were erected to provide a stable crash deck and protected working environment while the large concrete slabs were cut out, giving the team a secure platform for the next stage of the redevelopment.

Phased Adaptation

As the mill redevelopment progresses, the scaffolds can be adapted or repositioned to suit the next phases of the lift and stair installation.

Clean Site

Both structures were erected within the agreed three-day programme, leaving the work areas ready for the next trades and allowing the wider redevelopment works to continue.

Trusted & Accredited

Project Gallery

View the project

Client Feedback

What the Client Said

Can’t fault the scaffolds; they got done on time so works could continue.

Site Manager
Mill Redevelopment Project